WORK EXPERIENCE
GÜROL ALDANMAZ
1. Name
Gürol Aldanmaz, Mechanical Engineer
2. Company
Yess Yakma ve Enerji Sist. San. ve Tic. Ltd. Şti.
3. Position
Managing Director
4. Contact
e-mail : gurolaldanmaz@gmail.com - proje@yess-enerji.com
Phone : (0532) 778 34 25
5. Education
-
University: Yıldız Technical University, Mechanical Engineering, 1993
High School: Tütün Çiftlik Vocational High School, Electrical Department, 1986
6. WORK EXPERIENCE – In Manufacturing, Contracting, and Project Works
a) RANTEKO / MEY ALKOLLÜ İÇECEKLER INDUSTRY (2024)
• Boiler Information
o Steam Capacity: 2.5 ton/h
o Operating Pressure: 6.0 barg
o Saturated Steam
o Boiler Type: Forward Moving Grate, Single Drum, Shell Boiler
o Fuel Type: Biomass – Anoson Husk
• Scope of Work:o Thermal Calculations of Boiler and Equipment
o Strength Calculations of Boiler and Pressure Equipment
o Preparation of Basic Design Projects
o Preparation of Manufacturing Drawings
o Preparation of P&IDs
o Preparation of Valve and Instrument Lists
o Preparation of Equipment Lists
o Preparation of Combustion Scenarios
b) TÜRKŞEKER ANKARA MAKİNA FABRİKASI ( 2024 )
• Boiler Information
o Steam Capacity: 40 ton/h
o Operating Pressure: 30 barg
o Superheated Steam Temperature: 400 ºC
o Boiler Type: D-Type
o Fuel Type: Natural Gas + Fuel Oil
• Scope of Work:
o Thermal Calculations of Boiler and Equipment
o Strength Calculations of Boiler and Pressure Equipment
o Preparation of Basic Design Projects
o Preparation of General Arrangement Drawings
o Preparation of Steel Structure and Platform Projects
o Preparation of Manufacturing Drawings
o Preparation of P&IDs
o Preparation of Valve and Instrument Lists
c) PRIMEPROCESS ( 2024 )
• Boiler Information
o Steam Capacity: 5.0 ton/h
o Operating Pressure: 10.0 barg
o Saturated Steam
o Boiler Type: Fire Tube
o Fuel Type: Sulfur
• Scope of Work:
o Thermal Calculations of Boiler and Equipment
o Strength Calculations of Boiler and Pressure Equipment
o Preparation of Basic Design Projects
o Preparation of 3D Projects
o Preparation of P&IDs
o Preparation of Valve and Instrument Lists
o Preparation of Equipment Lists
d) ENŞAH KAZAN ( 2023 – 2024 )
• Boiler Information
o Steam Capacity: 30.0 ton/h
o Operating Pressure: 43.0 barg
o Saturated Steam
o Boiler Type: Rotary Grate, Water Tube, Double Drum
o Fuel Type: Imported Coal
o Quantity: 2 Units
• Scope of Work:
o Thermal Calculations of Boiler Pressure Parts and Equipment
o Strength Calculations of Boiler and Pressure Equipment
o Preparation of Basic Design Projects
o Preparation of Manufacturing Drawings for Pressure Parts
o Preparation of 3D Projects
o Preparation of P&IDs
o Preparation of Valve and Instrument Lists
o Preparation of Equipment Lists
• Boiler Information
o Steam Capacity: 30.0 ton/h
o Operating Pressure: 10.0 barg
o Saturated Steam
o Boiler Type: Rotary Grate, Water Tube + Shell Boiler, Single Drum
o Fuel Type: Domestic Coal
o Quantity: 2 Units
• Scope of Work:
o Thermal Calculations of Boiler Pressure Parts and Equipment
o Strength Calculations of Boiler and Pressure Equipment
o Preparation of Basic Design Projects
o Preparation of 3D Projects
o Preparation of Equipment Lists
• Boiler Information
o Steam Capacity: 25.0 ton/h
o Operating Pressure: 10.0 barg
o Saturated Steam
o Boiler Type: Rotary Grate, Water Tube + Shell Boiler, Single Drum
o Fuel Type: Biomass (Pellet)
o Quantity: 1 Unit
• Scope of Work:
o Thermal Calculations of Boiler Pressure Parts and Equipment
o Strength Calculations of Boiler and Pressure Equipment
o Preparation of Basic Design Projects
o Preparation of Equipment Lists
e) HİSARMAK KAZAN SANAYİ ( 2022 – 2024 )
• Boiler Information
o Steam Capacity: 18.0 ton/h
o Operating Pressure: 21.0 barg
o Superheated Steam Temperature: 300 ºC
o Boiler Type: Rotary Grate, Water Tube, Single Drum
o Fuel Type: Biomass (Pellet)
o Quantity: 3 Units
• Scope of Work:
o Thermal Calculations of Boiler Pressure Parts and Equipment
o Strength Calculations of Boiler and Pressure Equipment
o Preparation of Basic Design Projects
o Preparation of Manufacturing Drawings for Pressure Parts
o Preparation of 3D Projects
o Preparation of P&IDs
o Preparation of Valve and Instrument Lists
o Preparation of Equipment Lists
o Preparation of Combustion Scenarios
f) BİRLİK ÜRETİM ENERJİ SAN. VE TİC ANONİM ŞTİ. ( 2022 )
• Boiler Information
o Steam Capacity: 45.0 ton/h
o Operating Pressure: 40.0 barg
o Superheated Steam Temperature: 450 ºC
o Boiler Type: Grate-Fired, Water Tube, Single Drum
o Fuel Type: Biomass
• Performed Works
o Design of Drum Internal Accessories
o Supervision Service
g) RANTEKO / BEYPİLİÇ ( 2022 )
• Boiler Information
o Steam Capacity: 30.0 ton/h
o Operating Pressure: 11.0 barg
o Saturated Steam
o Boiler Type: Fluidized Bed, Water Tube, Single Drum
o Fuel Type: Chicken Manure
• Scope of Work:
o Strength Calculations of Boiler and Pressure Equipment
o Preparation of Drum Basic Design Projects
o Preparation of Drum Detailed Drawings
o Preparation of P&IDs
o Preparation of Valve and Instrument Lists
o Provision of Consulting Services
h) RANTEKO / ZNP ENERJİ SANTRALİ ( 2020 – 2022 )
• Boiler Information
o Steam Capacity: 75.0 ton/h
o Operating Pressure: 45.0 barg
o Superheated Steam Temperature: 450 ºC
o Boiler Type: Fluidized Bed, Water Tube, Double Drum
o Fuel Type: Biomass (Wood bark, 10% treated sludge, pallet wood, etc.)
• Scope of Work:
o Thermal Calculations of Boiler and Equipment
o Strength Calculations of Boiler and Pressure Equipment
o Preparation of Basic Design Projects
o Preparation of Detailed Drawings
o Design of Bag Filter System
o Preparation of P&IDs
o Preparation of Valve and Instrument Lists
o Preparation of Equipment Lists
o Preparation of Combustion Scenarios
o Provision of Consulting Services
i) OĞUL ENERJİ ( 2019 – 2021 )
• Boiler Information
o Steam Capacity: 27.0 ton/h
o Operating Pressure: 62 barg
o Superheated Steam Temperature: 480 ºC
o Boiler Type: Fluidized Bed, Water Tube
o Fuel Type: Biomass (Wood bark, hazelnut shell, pallet wood, etc.)
• Position:
o Consulting and Supervision Services
• Scope of Work:
o Inspection and Reporting of the Boiler
o Commissioning of the Plant
j) ZEUS ENERJİ ( 2019 – 2023 )
• Boiler Information
o Steam Capacity: — ton/h
o Operating Pressure: 60 barg
o Superheated Steam Temperature: 480 ºC
o Boiler Type: Fluidized Bed, Water Tube, Double Drum
o Fuel Type: Biomass (Wood bark, hazelnut shell, pallet wood, etc.)
• Position:
o Consulting and Supervision Services
• Scope of Work:
o Inspection and Reporting of the Boiler
k) TÜRKŞEKER EMAF ( 2020 – 2021)
o Yozgat Sorgun Sugar Factory
• Boiler Information
o Steam Capacity: 75 ton/h
o Operating Pressure: 34 barg
o Superheated Steam Temperature: 410 ºC
o Boiler Type: Fluidized Bed, Water Tube, Double Drum
o Fuel Type: Domestic Coal
• Position:
o Consulting and Supervision Services
• Scope of Work:
o Identification of Missing Boiler Materials
o Design and Commissioning of Additional Boiler Start-Up Burner Windbox
o Preparation of Procurement Specifications
o Supervision of Installation Works
o Execution of Commissioning Activities
o Preparation of Boiler Fabrication As-Built Documents
l) ERALP KAZAN / GÜNGÖR ENERJİ ÜRETİM A.Ş. ( 2021 – 2022 )
• Boiler Information
o Güngör Energy 35 tph / 45 barg / 450 ºC Biomass Power Plant
o Fuel: Biomass
• Position:
o Consulting and Supervision Services
• Scope of Work:
o Preparation of P&ID and PFD Diagrams
o Commissioning Supervision Services
o Performance Testing (EN 12952-15)
o Preparation of Combustion Scenarios
m) ODAŞ ÇAN-2 THERMAL POWER PLANT (2016 – 2019)
o Took part in various stages of the 330 MW coal power plant project, which was relocated from abroad and reassembled in Çan.
o Provided supervision services for maintenance, repair, and testing of Lisega brand spring supports, including preparation of test reports, sealing, and completion of deficiencies.
o Designed and supervised the fabrication of pipeline guide and fixed supports.
o Designed, fabricated, and supervised installation of a 40 ton/h capacity fuel-oil pumping station.
o Designed and fabricated instrument condensate pots.
o Provided project support consulting for piping systems.
o Supervised installation and commissioning works.
n) VARAKA – ALBAYRAK PAPER FACTORY (2018 – 2018)
o Provided engineering and site support for the installation of a TGM Kanis 40 MWe turbine at VARAKA Paper Factory, including turbine, condenser, and equipment installation, as well as partial steam and oil line assembly.
o Carried out low-voltage cabling and tray works, prepared quality documentation, and managed fabrication and installation of turbine platforms.
o) TERMO ISI SİSTEMLERİ SAN. VE TİC. A.Ş. (2013 – 2016)
• Position:
o Project & Contracting Manager
• Scope of Work:
o Material Assessment Reports for Thermal Power Plant Equipment
o TÜBİTAK Pulverized Coal Firing System Design Project
o Preparation of Fuel Line P&IDs and PFDs for PC Boiler and CFB Boiler Start-Up Burners
o Preparation of Specifications and Tender Documents for Water Tube and Fire Tube Boilers
p) ÖZTAŞ / ETİ KIRKA BOR TESİLERİ ( 2012 – 2013)
• Position:
o Project Supervisor
• Boiler Information
o Steam Capacity: 75 ton/h
o Operating Pressure: 45 barg
o Superheated Steam Temperature: 455 ºC
o Boiler Type: Circulating Fluidized Bed Boiler (CFB Boiler)
o Fuel Type: Lignite Coal
• Scope of Work:
o Preparation of P&IDs and PFDs
o Selection of Valves and Instruments and Preparation of Lists
o Selection of Feedwater Pumps
o Project Design Studies
o Selection of Turbine Bearing Oil Cooling System and Preparation of P&IDs and PFDs
o Design of Flash Tank and Blowdown Tank
o Preparation of Technical Specifications for Procurement and Definition of Battery Limits
o Preparation of Budget Proposals
q) AKSA AKRİLİK KİMYA SAN. A.Ş. (2009 – 2011)
• Position:
o Project Supervisor and Site Chief
o Modification and partial renewal, installation, and commissioning of a second-hand boiler brought from South Africa
• Boiler Information
o Steam Capacity: 410 ton/h
o Operating Pressure: 96 barg
o Superheated Steam Temperature: 520 ºC
o Boiler Type: Pulverized Coal-Fired Boiler (PC Boiler)
o Fuel Type: Coal (Second-hand Unit)
• Scope of Work:
o Completion and installation of 410 t/h, 96 barg, 520 ºC steam boiler, BOP equipment, air and gas ducts, water, and superheated steam lines
o Design, manufacturing supervision, and installation of components requiring renewal or modification (superheater, economizer, ESP, boiler walls, etc.)
o Installation of boiler feedwater lines and pumps
o Installation of valves and instruments
o Installation of 60 bar DN200 superheated steam line (880 m)
o Installation of 75 MWe condensing turbine and 25 MWe backpressure turbine
o Installation of mills, pulverized coal transfer lines, LUVO, ESP, ID fan, PA and SA fans
o Installation and completion of gas ducts
o Design and supervision of refractory works
o Thermal insulation works
r) PETLAS LASTİK SAN. VE TİCARET A.Ş. (2011 – 2012)
• Position:
o Project Supervisor and Site Chief
• Boiler Information
o Steam Capacity: 32.5 ton/h
o Operating Pressure: 38 barg
o Superheated Steam Temperature: 450 ºC
o Boiler Type: Circulating Fluidized Bed Boiler (CFB Boiler)
o Fuel Type: Coal
o Quantity: 2 Units
• Scope of Work:
o Preparation and revision of P&ID and PFD diagrams
o Selection of valves, instruments, and feedwater pumps
o Installation of 32.5 t/h, 38 barg, 450 ºC steam boiler, deaerator, and feedwater tank
o Design and installation of superheated steam lines and pipe bridges
o Installation of feedwater lines and pumps, blowdown tank, and flash tank
o Valve and instrument installations
o Installation of coal preparation and transfer systems, lime silo, and boiler feeding system
o Installation of ash transfer system, ESP, recuperator, ID fan, PA and SA fans
o Installation of air and gas ducts, refractory, insulation, electrical and automation systems
o Installation of continuous flue gas measurement system
o Commissioning
s) MED-MAR – Çankırı (2011 – 2012)
• Position:
o Project Supervisor and Site Chief
• Boiler Information
o Steam Capacity: 24 ton/h
o Operating Pressure: 42 barg
o Superheated Steam Temperature: 455 ºC
o Boiler Type: Circulating Fluidized Bed Boiler (CFB Boiler)
o Fuel Type: Lignite Coal
• Scope of Work:
o Preparation and revision of P&ID and PFD diagrams
o Supervision of installation and inspection works for 24 ton/h, 45 barg, 455 ºC steam boiler and its equipment
t) OYKA PAPER & PACKAGING INDUSTRY INC. (2007 – 2009)
• Position:
o Site Chief for Manufacturing Control and Installation of Water Tube Steam Boiler
• Boiler Information
o Steam Capacity: 35 ton/h
o Operating Pressure: 59 barg
o Superheated Steam Temperature: 480 ºC
o Boiler Type: Forward Moving Grate, Water Tube, Double Drum
o Fuel Type: Biomass (Wood bark, hazelnut shell, pallet wood, etc.)
• Scope of Work:
o Reinforced concrete construction
o Steel structure works and boiler equipment installation
o Installation of recuperator, multicyclone, bag filter, stack, shell bunker (100 m³), ash silo, conveyor belts, daily bunker, and slag crusher
o Installation of ash transfer system (pneumatic and chain type)
o Design and installation of superheated steam lines
o Electrical and automation works
o Hydrostatic tests, commissioning, and performance tests
o Preparation of operation and maintenance manuals