WORK EXPERIENCE  
GÜROL ALDANMAZ

1. Name

Gürol Aldanmaz, Mechanical Engineer

2. Company

Yess Yakma ve Enerji Sist. San. ve Tic. Ltd. Şti.

3. Position

Managing Director

4. Contact

e-mail : gurolaldanmaz@gmail.com - proje@yess-enerji.com

Phone : (0532) 778 34 25

5. Education
  • University: Yıldız Technical University, Mechanical Engineering, 1993  
    High School: Tütün Çiftlik Vocational High School, Electrical Department, 1986

6. WORK EXPERIENCE – In Manufacturing, Contracting, and Project Works

a) RANTEKO / MEY ALKOLLÜ İÇECEKLER INDUSTRY (2024)
•     Boiler Information
o   Steam Capacity: 2.5 ton/h  
o   Operating Pressure: 6.0 barg  
o   Saturated Steam  
o   Boiler Type: Forward Moving Grate, Single Drum, Shell Boiler  
o   Fuel Type: Biomass – Anoson Husk
•     Scope of Work:o   Thermal Calculations of Boiler and Equipment  
o   Strength Calculations of Boiler and Pressure Equipment  
o   Preparation of Basic Design Projects  
o   Preparation of Manufacturing Drawings  
o   Preparation of P&IDs  
o   Preparation of Valve and Instrument Lists  
o   Preparation of Equipment Lists  
o   Preparation of Combustion Scenarios

b)    TÜRKŞEKER ANKARA MAKİNA FABRİKASI ( 2024 )

•     Boiler Information  
o   Steam Capacity: 40 ton/h  
o   Operating Pressure: 30 barg  
o   Superheated Steam Temperature: 400 ºC  
o   Boiler Type: D-Type  
o   Fuel Type: Natural Gas + Fuel Oil  

•     Scope of Work:  
o   Thermal Calculations of Boiler and Equipment  
o   Strength Calculations of Boiler and Pressure Equipment  
o   Preparation of Basic Design Projects  
o   Preparation of General Arrangement Drawings  
o   Preparation of Steel Structure and Platform Projects  
o   Preparation of Manufacturing Drawings  
o   Preparation of P&IDs  
o   Preparation of Valve and Instrument Lists
 


c)     PRIMEPROCESS ( 2024 )

•     Boiler Information  
o   Steam Capacity: 5.0 ton/h  
o   Operating Pressure: 10.0 barg  
o   Saturated Steam  
o   Boiler Type: Fire Tube  
o   Fuel Type: Sulfur  

•     Scope of Work:  
o   Thermal Calculations of Boiler and Equipment  
o   Strength Calculations of Boiler and Pressure Equipment  
o   Preparation of Basic Design Projects  
o   Preparation of 3D Projects  
o   Preparation of P&IDs  
o   Preparation of Valve and Instrument Lists  
o   Preparation of Equipment Lists
 


d)    ENŞAH KAZAN ( 2023 – 2024 )
•     Boiler Information  
o   Steam Capacity: 30.0 ton/h  
o   Operating Pressure: 43.0 barg  
o   Saturated Steam  
o   Boiler Type: Rotary Grate, Water Tube, Double Drum  
o   Fuel Type: Imported Coal  
o   Quantity: 2 Units  

•     Scope of Work:  
o   Thermal Calculations of Boiler Pressure Parts and Equipment  
o   Strength Calculations of Boiler and Pressure Equipment  
o   Preparation of Basic Design Projects  
o   Preparation of Manufacturing Drawings for Pressure Parts  
o   Preparation of 3D Projects  
o   Preparation of P&IDs  
o   Preparation of Valve and Instrument Lists  
o   Preparation of Equipment Lists  

•     Boiler Information  
o   Steam Capacity: 30.0 ton/h  
o   Operating Pressure: 10.0 barg  
o   Saturated Steam  
o   Boiler Type: Rotary Grate, Water Tube + Shell Boiler, Single Drum  
o   Fuel Type: Domestic Coal  
o   Quantity: 2 Units  

•     Scope of Work:  
o   Thermal Calculations of Boiler Pressure Parts and Equipment  
o   Strength Calculations of Boiler and Pressure Equipment  
o   Preparation of Basic Design Projects  
o   Preparation of 3D Projects  
o   Preparation of Equipment Lists  

•     Boiler Information  
o   Steam Capacity: 25.0 ton/h  
o   Operating Pressure: 10.0 barg  
o   Saturated Steam  
o   Boiler Type: Rotary Grate, Water Tube + Shell Boiler, Single Drum  
o   Fuel Type: Biomass (Pellet)  
o   Quantity: 1 Unit  

•     Scope of Work:  
o   Thermal Calculations of Boiler Pressure Parts and Equipment  
o   Strength Calculations of Boiler and Pressure Equipment  
o   Preparation of Basic Design Projects  
o   Preparation of Equipment Lists
 


e)    HİSARMAK KAZAN SANAYİ ( 2022 – 2024 )

•     Boiler Information  
o   Steam Capacity: 18.0 ton/h  
o   Operating Pressure: 21.0 barg  
o   Superheated Steam Temperature: 300 ºC  
o   Boiler Type: Rotary Grate, Water Tube, Single Drum  
o   Fuel Type: Biomass (Pellet)  
o   Quantity: 3 Units  

•     Scope of Work:  
o   Thermal Calculations of Boiler Pressure Parts and Equipment  
o   Strength Calculations of Boiler and Pressure Equipment  
o   Preparation of Basic Design Projects  
o   Preparation of Manufacturing Drawings for Pressure Parts  
o   Preparation of 3D Projects  
o   Preparation of P&IDs  
o   Preparation of Valve and Instrument Lists  
o   Preparation of Equipment Lists  
o   Preparation of Combustion Scenarios


f)    BİRLİK ÜRETİM ENERJİ SAN. VE TİC ANONİM ŞTİ. ( 2022 )

•     Boiler Information  
o   Steam Capacity: 45.0 ton/h  
o   Operating Pressure: 40.0 barg  
o   Superheated Steam Temperature: 450 ºC  
o   Boiler Type: Grate-Fired, Water Tube, Single Drum  
o   Fuel Type: Biomass  

•     Performed Works  
o   Design of Drum Internal Accessories  
o   Supervision Service
 


g)    RANTEKO / BEYPİLİÇ ( 2022 )

•     Boiler Information  
o   Steam Capacity: 30.0 ton/h  
o   Operating Pressure: 11.0 barg  
o   Saturated Steam  
o   Boiler Type: Fluidized Bed, Water Tube, Single Drum  
o   Fuel Type: Chicken Manure  

•     Scope of Work:  
o   Strength Calculations of Boiler and Pressure Equipment  
o   Preparation of Drum Basic Design Projects  
o   Preparation of Drum Detailed Drawings  
o   Preparation of P&IDs  
o   Preparation of Valve and Instrument Lists  
o   Provision of Consulting Services
 


h)    RANTEKO / ZNP ENERJİ SANTRALİ ( 2020 – 2022 )

•     Boiler Information  
o   Steam Capacity: 75.0 ton/h  
o   Operating Pressure: 45.0 barg  
o   Superheated Steam Temperature: 450 ºC  
o   Boiler Type: Fluidized Bed, Water Tube, Double Drum  
o   Fuel Type: Biomass (Wood bark, 10% treated sludge, pallet wood, etc.)  

•     Scope of Work:  
o   Thermal Calculations of Boiler and Equipment  
o   Strength Calculations of Boiler and Pressure Equipment  
o   Preparation of Basic Design Projects  
o   Preparation of Detailed Drawings  
o   Design of Bag Filter System  
o   Preparation of P&IDs  
o   Preparation of Valve and Instrument Lists  
o   Preparation of Equipment Lists  
o   Preparation of Combustion Scenarios  
o   Provision of Consulting Services
 


i)    OĞUL ENERJİ ( 2019 – 2021 )

•     Boiler Information  
o   Steam Capacity: 27.0 ton/h  
o   Operating Pressure: 62 barg  
o   Superheated Steam Temperature: 480 ºC  
o   Boiler Type: Fluidized Bed, Water Tube  
o   Fuel Type: Biomass (Wood bark, hazelnut shell, pallet wood, etc.)  

•     Position:  
o   Consulting and Supervision Services  

•     Scope of Work:  
o   Inspection and Reporting of the Boiler  
o   Commissioning of the Plant
 


j)    ZEUS ENERJİ ( 2019 – 2023 )
•     Boiler Information

o   Steam Capacity: — ton/h  
o   Operating Pressure: 60 barg  
o   Superheated Steam Temperature: 480 ºC  
o   Boiler Type: Fluidized Bed, Water Tube, Double Drum  
o   Fuel Type: Biomass (Wood bark, hazelnut shell, pallet wood, etc.)  

•     Position:  
o   Consulting and Supervision Services  

•     Scope of Work:  
o   Inspection and Reporting of the Boiler
 


k)    TÜRKŞEKER EMAF ( 2020 – 2021)

o   Yozgat Sorgun Sugar Factory  

•     Boiler Information  
o   Steam Capacity: 75 ton/h  
o   Operating Pressure: 34 barg  
o   Superheated Steam Temperature: 410 ºC  
o   Boiler Type: Fluidized Bed, Water Tube, Double Drum  
o   Fuel Type: Domestic Coal  

•     Position:  
o   Consulting and Supervision Services  

•     Scope of Work:  
o   Identification of Missing Boiler Materials  
o   Design and Commissioning of Additional Boiler Start-Up Burner Windbox  
o   Preparation of Procurement Specifications  
o   Supervision of Installation Works  
o   Execution of Commissioning Activities  
o   Preparation of Boiler Fabrication As-Built Documents
 


l)    ERALP KAZAN / GÜNGÖR ENERJİ ÜRETİM A.Ş. ( 2021 – 2022 )

•     Boiler Information  
o   Güngör Energy 35 tph / 45 barg / 450 ºC Biomass Power Plant  
o   Fuel: Biomass  

•     Position:  
o   Consulting and Supervision Services  

•     Scope of Work:  
o   Preparation of P&ID and PFD Diagrams  
o   Commissioning Supervision Services  
o   Performance Testing (EN 12952-15)  
o   Preparation of Combustion Scenarios
 

m)     ODAŞ ÇAN-2 THERMAL POWER PLANT (2016 – 2019)  
o   Took part in various stages of the 330 MW coal power plant project, which was relocated from abroad and reassembled in Çan.  
o   Provided supervision services for maintenance, repair, and testing of Lisega brand spring supports, including preparation of test reports, sealing, and completion of deficiencies.  
o   Designed and supervised the fabrication of pipeline guide and fixed supports.  
o   Designed, fabricated, and supervised installation of a 40 ton/h capacity fuel-oil pumping station.  
o   Designed and fabricated instrument condensate pots.  
o   Provided project support consulting for piping systems.  
o   Supervised installation and commissioning works.  
 

n)     VARAKA – ALBAYRAK PAPER FACTORY (2018 – 2018)  
o   Provided engineering and site support for the installation of a TGM Kanis 40 MWe turbine at VARAKA Paper Factory, including turbine, condenser, and equipment installation, as well as partial steam and oil line assembly.  
o   Carried out low-voltage cabling and tray works, prepared quality documentation, and managed fabrication and installation of turbine platforms.  
 

o)     TERMO ISI SİSTEMLERİ SAN. VE TİC. A.Ş. (2013 – 2016)  
•     Position:  

o   Project & Contracting Manager  

•     Scope of Work:  
o   Material Assessment Reports for Thermal Power Plant Equipment  
o   TÜBİTAK Pulverized Coal Firing System Design Project  
o   Preparation of Fuel Line P&IDs and PFDs for PC Boiler and CFB Boiler Start-Up Burners  
o   Preparation of Specifications and Tender Documents for Water Tube and Fire Tube Boilers

p)    ÖZTAŞ / ETİ KIRKA BOR TESİLERİ ( 2012 – 2013)

•     Position:  
o   Project Supervisor  

•     Boiler Information  
o   Steam Capacity: 75 ton/h  
o   Operating Pressure: 45 barg  
o   Superheated Steam Temperature: 455 ºC  
o   Boiler Type: Circulating Fluidized Bed Boiler (CFB Boiler)  
o   Fuel Type: Lignite Coal  

•     Scope of Work:  
o   Preparation of P&IDs and PFDs  
o   Selection of Valves and Instruments and Preparation of Lists  
o   Selection of Feedwater Pumps  
o   Project Design Studies  
o   Selection of Turbine Bearing Oil Cooling System and Preparation of P&IDs and PFDs  
o   Design of Flash Tank and Blowdown Tank  
o   Preparation of Technical Specifications for Procurement and Definition of Battery Limits  
o   Preparation of Budget Proposals
 

q)     AKSA AKRİLİK KİMYA SAN. A.Ş. (2009 – 2011)  
•     Position:  

o   Project Supervisor and Site Chief  
o   Modification and partial renewal, installation, and commissioning of a second-hand boiler brought from South Africa  

•     Boiler Information  
o   Steam Capacity: 410 ton/h  
o   Operating Pressure: 96 barg  
o   Superheated Steam Temperature: 520 ºC  
o   Boiler Type: Pulverized Coal-Fired Boiler (PC Boiler)  
o   Fuel Type: Coal (Second-hand Unit)  

•     Scope of Work:  
o   Completion and installation of 410 t/h, 96 barg, 520 ºC steam boiler, BOP equipment, air and gas ducts, water, and superheated steam lines  
o   Design, manufacturing supervision, and installation of components requiring renewal or modification (superheater, economizer, ESP, boiler walls, etc.)  
o   Installation of boiler feedwater lines and pumps  
o   Installation of valves and instruments  
o   Installation of 60 bar DN200 superheated steam line (880 m)  
o   Installation of 75 MWe condensing turbine and 25 MWe backpressure turbine  
o   Installation of mills, pulverized coal transfer lines, LUVO, ESP, ID fan, PA and SA fans  
o   Installation and completion of gas ducts  
o   Design and supervision of refractory works  
o   Thermal insulation works  

r)     PETLAS LASTİK SAN. VE TİCARET A.Ş. (2011 – 2012)  
•     Position:  

o   Project Supervisor and Site Chief  

•     Boiler Information  
o   Steam Capacity: 32.5 ton/h  
o   Operating Pressure: 38 barg  
o   Superheated Steam Temperature: 450 ºC  
o   Boiler Type: Circulating Fluidized Bed Boiler (CFB Boiler)  
o   Fuel Type: Coal  
o   Quantity: 2 Units  

•     Scope of Work:  
o   Preparation and revision of P&ID and PFD diagrams  
o   Selection of valves, instruments, and feedwater pumps  
o   Installation of 32.5 t/h, 38 barg, 450 ºC steam boiler, deaerator, and feedwater tank  
o   Design and installation of superheated steam lines and pipe bridges  
o   Installation of feedwater lines and pumps, blowdown tank, and flash tank  
o   Valve and instrument installations  
o   Installation of coal preparation and transfer systems, lime silo, and boiler feeding system  
o   Installation of ash transfer system, ESP, recuperator, ID fan, PA and SA fans  
o   Installation of air and gas ducts, refractory, insulation, electrical and automation systems  
o   Installation of continuous flue gas measurement system  
o   Commissioning  

s)     MED-MAR – Çankırı (2011 – 2012)  
•     Position:  

o   Project Supervisor and Site Chief  

•     Boiler Information  
o   Steam Capacity: 24 ton/h  
o   Operating Pressure: 42 barg  
o   Superheated Steam Temperature: 455 ºC  
o   Boiler Type: Circulating Fluidized Bed Boiler (CFB Boiler)  
o   Fuel Type: Lignite Coal  

•     Scope of Work:  
o   Preparation and revision of P&ID and PFD diagrams  
o   Supervision of installation and inspection works for 24 ton/h, 45 barg, 455 ºC steam boiler and its equipment  

t)     OYKA PAPER & PACKAGING INDUSTRY INC. (2007 – 2009)  
•     Position:  

o   Site Chief for Manufacturing Control and Installation of Water Tube Steam Boiler  

•     Boiler Information  
o   Steam Capacity: 35 ton/h  
o   Operating Pressure: 59 barg  
o   Superheated Steam Temperature: 480 ºC  
o   Boiler Type: Forward Moving Grate, Water Tube, Double Drum  
o   Fuel Type: Biomass (Wood bark, hazelnut shell, pallet wood, etc.)  

•     Scope of Work:  
o   Reinforced concrete construction  
o   Steel structure works and boiler equipment installation  
o   Installation of recuperator, multicyclone, bag filter, stack, shell bunker (100 m³), ash silo, conveyor belts, daily bunker, and slag crusher  
o   Installation of ash transfer system (pneumatic and chain type)  
o   Design and installation of superheated steam lines  
o   Electrical and automation works  
o   Hydrostatic tests, commissioning, and performance tests  
o   Preparation of operation and maintenance manuals